Solar panels in Dublin
We install solar across Dublin city and county, and being based here, the site survey is usually within a few days, not a few weeks.
Dublin is where we do most of our work, from terraced houses in Drimnagh and Cabra to semi-Ds in Tallaght, Swords, and Blanchardstown, and bigger roofs out towards Malahide and Killiney. Dublin roofs are a mixed bag (old slate, newer tile, flat-roof extensions) and we survey every one properly before quoting, because the right system depends on what your roof can actually carry.
City installs come with city questions: terraced access, shared chimneys, shading from the house next door, and older fuseboards that need upgrading before panels go anywhere near the roof. Because we're electricians first, that prep work is done by us, not a subcontractor, and it's certified properly.
A typical Dublin semi-D takes a 10-14 panel system, installed in one to two days. We handle the SEAI grant paperwork and the ESB Networks notification, and you get the full handover pack: certs, warranties, and the app that shows you what your roof is doing.
Areas we cover in Dublin
Thinking about solar in Dublin?
Free consultation, fixed quote, SEAI grant paperwork sorted. No hard sell.
